RecosysAdmin : Full access, including cluster scaling, schema changes, and secret management. Step 2: Establishing the Remote Configuration File
Always cut electricity at the main breaker before installation. Connect the wire to Phase, to Neutral, and Yellow/Green/Grey wires to your specific fan or light loads as per the Recosys wiring diagram Manual Override: recosys remote manual